Release management: start with one name and a rollback

Release management: start with one name and a rollback

Someone adds an extra field to the contact form on your website. The form works locally, and the change goes live. A few days later sales asks why no enquiries from the website have reached the CRM since the change. Only then does someone have to work out who rolls back to the old version and how long that takes. Release management is how you settle that in advance, at a quiet moment.

The same happens with an update that needs more server capacity than there is, or with an app version that doesn't match the API in production. The aim of a release process is that a mistake like that is spotted quickly and fixed calmly.

Outages fall between suppliers

Many organisations work with good people and good intentions, but without fixed release agreements. A developer finishes a change and once a project manager approves it, it's live. Sometimes that works fine, until an integration is involved that nobody had thought about.

Usually what's missing is an overview of how the parts fit together. The developer knows the code, the host knows the server and the supplier knows the integration, while nobody has the full picture. When development, hosting and integrations are spread across different parties, gaps in responsibility appear between those parties. That's often exactly where the delay or the outage comes from.

For a business with critical digital processes, that is an expensive model. On top of lost revenue, an outage brings lost time, unclear communication and responsibility being passed around.

If you have no technical team of your own, a partner who oversees development and infrastructure adds extra value. When software, hosting and support fit together, you know straight away where a problem belongs. At LJPc we work from that responsibility: we fix what goes wrong.

First, one name per release

First, appoint one release owner for every release. That person owns the decision to go live, the communication and the progress, even when others do the hands-on work.

Also agree where the technical judgement ends and the business decision begins. Whether a temporary limitation for users is acceptable is decided by the person responsible for operations, with the developer's assessment alongside. Set those roles in advance and the technical team can focus on recovery during an outage.

Release management starts with preparation

For most organisations, a workable release flow consists of preparation, validation, go-live and aftercare. Each phase ends with a concrete decision by someone with a name. For preparation and validation, these are the three steps we would always include.

Write down what stays out

Describe exactly what goes live and what the business gains from it. For example: customers can now pay with a new payment method, or staff see up-to-date stock information in the internal dashboard. Then write down what falls outside the release.

We find that second list the most useful. It stops a change being squeezed in at the last minute because it's ‘almost done anyway’. If an addition like that hasn't been tested in combination with the rest, something small can have big consequences.

Find out what the change touches

For every release, go through the parts it affects: databases, email sending, external APIs, caches, mobile apps, background processes and hosting configuration. The form from the opening touched the integration with the CRM, and that was on nobody's list. A change that works fine locally can behave differently in production because of different permissions, volumes, data or network rules.

If an external party is involved, such as a payment provider, ERP supplier or marketing platform, check before go-live whether maintenance is planned and which limits or version requirements apply.

Test what the customer does

Alongside the technical tests, run through the most important scenarios from start to finish. A customer places an order, the order arrives correctly, the confirmation is right and the accounts team can process it. For the form, that means sending a test enquiry and checking that it shows up in the CRM.

Where possible, test on an acceptance environment that closely resembles production. It can be smaller, as long as you know the differences in configuration, integrations and permissions. Otherwise you are mostly testing on an environment your customer never uses.

For larger or riskier changes, roll out in phases. You switch a feature on for a limited group of users first, move traffic over step by step or run a new integration alongside the existing one for a while. That sometimes takes extra preparation. In return, the impact is smaller if something unexpected happens.

A rollback you can explain

A checklist only works if it is short enough to actually use. So make one per type of release, because a content change needs something different from a database update or a change to an API. These checks belong on the list almost every time:

  • The scope, the owner and the go-live moment are confirmed.
  • The critical user scenarios have been tested and approved.
  • Backup, recovery procedure and the person responsible for rollback are arranged.
  • Monitoring and error reports are actively followed after go-live.
  • Staff, customers or suppliers involved know what to expect.

The third point deserves extra attention. Turn ‘we'll roll it back if it goes wrong’ into a plan by writing down which version goes back, how long that takes, whether the data changes can be reversed and who makes the call. If that does not fit in a few lines, the release is not ready to go live.

With a database migration, rolling back can be unsafe or complicated. Decide in advance whether a temporary fix is the better route, because during an outage nobody has the headspace to make that choice well.

The hours after go-live count

A release is finished once you have seen that everything works, and you see that in the first minutes and hours after go-live. Besides checking that the website is reachable, check error reports, response times, conversions, queues and the behaviour of integrations. With the form, a look at the number of new enquiries in the CRM would have shown the fault on the same day.

Agree in advance who monitors and for how long. For a small change, fifteen minutes of focused checking can be enough. If the release touches the ordering process, the login or an important integration, plan closer follow-up. Also agree the thresholds at which you step in. Then that decision is already made by the time customers are affected.

If the same error report comes back after several releases, you have found a structural issue in design, testing or infrastructure.

Small releases need automation

Choose the rhythm based on the impact of an outage, the maturity of your testing process and the nature of the changes. Our preference is small, frequent releases. An e-commerce platform under continuous development can benefit from them, because the size of each change is often smaller. That takes automation, clear monitoring and discipline. If those are missing, invest in them first and work with a fixed maintenance window until then.

A fixed window with extra checks also suits a business that runs on a business-critical planning system. Releasing less often gives more preparation time. The risk lies in the size, because larger bundles make a problem harder to isolate.

Above all, drop the pattern of postponing releases until a large collection of changes is ready. A release like that becomes harder to test and harder to roll back.

One improvement per release

After every release that mattered, plan a short review focused on what could go better next time. These questions give enough to work with:

  • Did the test environment resemble production closely enough?
  • Was the communication on time?
  • Were the logs useful?
  • Was the rollback needed, and did it work as expected?

Then pick one concrete improvement and put it in place straight away, even if it is one extra line on the checklist. After a number of releases you end up with a process that fits your own systems and the way you work.

Start with the next release on the schedule. Add two things to it: the name of the release owner and the rollback in a few lines. If the second one doesn't work out, you know what you still need to work out before go-live.